The extension drill program at Maximus Hilditch Gold Project has been completed

Aug 15, 2024

Maximus Resources Limited (ASX: MXR) presents the exciting results from a comprehensive 1,500m Reverse Circulation drill program at the Hilditch Gold Project. An infill and resource extension drill program has been successfully carried out at Maximus’ Hilditch Gold Project, showcasing the immense potential to enhance the classification of mineral resources. The 26-hole, 1,514m Reverse Circulation drill program consistently intersected shallow gold mineralization within a targeted, optimized pit shell.

Preliminary metallurgical results have demonstrated impressive gold recoveries between 91.4% and 95.8%. Furthermore, additional metallurgical test work is underway to determine gravity recoveries, grind size, and reagent consumption of the Hilditch mineralization.

 

 

Customer Notice:

Nextgen Global Services Pty Ltd trading as Kapitales Research (ABN 89 652 632 561) is a Corporate Authorised Representative (CAR No. 1293674) of Enva Australia Pty Ltd (AFSL 424494). The information contained in this website is general information only. Any advice is general advice only. No consideration has been given or will be given to the individual investment objectives, financial situation or needs of any particular person. The decision to invest or trade and the method selected is a personal decision and involves an inherent level of risk, and you must undertake your own investigations and obtain your own advice regarding the suitability of this product for your circumstances. Please be aware that all trading activity is subject to both profit & loss and may not be suitable for you. The past performance of this product is not and should not be taken as an indication of future performance.

Kapitales Research, Level 13, Suite 1A, 465 Victoria Ave, Chatswood, NSW 2067, Australia | 1800 005 780 | info@kapitales.com